Line Control Automation upgrade VAN

Line_control-ug17
  • Component upgrade
  • Transportation
  • Construction
  • Communication
  • Energy
Your line risks a complete shut down because of obsolete line control technology. Don't keep your customers waiting and let your reputation suffer.
What's included
  • Tailor made upgrades from S5 PLC to S7 / TIA Portal

  • Process Supervisor Unit or Operating panel upgrade to extend your equipment lifetime and to have the latest application developments in use

  • Critical item upgrade for improved reliability, functionality and lower operational costs

  • Skilled engineering and commissioning with minimum disturbances of your production

  • Peace of mind for spare parts and technical support

Technology becomes obsolete and process requirements may change

Why would one consider an upgrade of their line control? Technology changes almost daily, whether we like it or not. Maybe an electronic part is no longer available, or there are growing incompatibilities with your working environment, or the maintenance effort is becoming unacceptable. Automated manufacturing equipment requires technology to function. So, don’t let obsolescence become a handicap to performance or have it suddenly stop your production. Modern technology allows also better production control and data evaluation for production and maintenance needs.

Upgrade solution

We can help you upgrade your line controls with modern components. By preparing for an automation upgrade with us, you help secure future equipment availability. Our upgrades offer equivalent or even improved features. Turn to us for assistance in identifying the obsolescence risks and the improvement opportunities.

Act now

Technical support and spare parts for the obsolete components of your original operating panels, PLCs, electrical components etc. are limited or no longer existing. We strongly recommend that you consider an upgrade as a preventive measure against long down times and sudden failure of the obsolete components. The delivery time for upgrade is 16 weeks. Maillefer Services will assist you in planning the upgrade packages for your line control. Contact us at: services@maillefer.net

Need more details on the Line Control Automation upgrade VAN? Contact your nearest Maillefer representative →