- Component upgrade
- Construction
- Communication
- Energy
- Special
The Maillefer upgrade package includes a new control cabinet, operating panel and in some cases a motor and gear box replacement kit with all necessary interconnection cables.
Installation and start-up by your own maintenance team, with the help of documentation delivered with the upgrade.
When required, Maillefer can also provide a turnkey upgrade delivery.
Fits these components
17 components
Technology becomes obsolete and process requirements may change
This upgrade package will help you secure reliable production by replacing the obsolete PLC control unit, drives and motors for winding and traversing, and gear box for winding with modern technology. Future spare part supply and technical support for the quipment is ensured. By replacing the obsolete or old component some additional, improved functions can be added to equipment to increase the equipment performance.
Upgrade solution
With this Pay-off and Take-up upgrade package we have seen equipment availability increase notably once the obsolete components are replaced by state-of-the technology.
Act now
Technical support and spare parts for the obsolete components of your Pay-off and Take-up are limited or no longer exist. We strongly recommend that you consider an upgrade as a preventive measure against long downtimes and sudden failure of obsolete components. The delivery time for an upgrade is 14 to 18 weeks. Maillefer Services will assist you in planning the upgrade packages for your single pay-offs or take-ups. Contact us at: services@maillefer.net
Need more details on the Single Pay-off & Take-up Drive, Motor & Gearbox Upgrade? Contact your nearest Maillefer representative →